Design of full access test system for valve control and sub-module control of flexible direct current transmission
WANG Qi1,2, YANG Zhangbin1,3,4, PENG Daixiao1, LIU Xiaoyong5
1. China Three Gorges Construction Engineering Corporation, Chengdu 610041; 2. Chongqing University, Chongqing 400044; 3. University of Chinese Academy of Sciences, Beijing 100049; 4. Institute of Electrical Engineering, Chinese Academy of Sciences, Beijing 100086; 5. Rongxin Huiko Electric Co., Ltd, Anshan, Liaoning 114051
Abstract:In view of the simplification and lack of valve control and sub-module design verification in the joint commissioning test stage of modular multi-level flexible HVDC system, a test platform for valve control equipment and sub-modular control total access testing is designed. The platform includes merging unit (MU) simulation device consistent with engineering sampling rate, pole control device with diversified control modes consistent with engineering interface, link delay test device with perfect function, and sub-module function simulation device that can completely realize engineering sub module interface and original program verification. By connecting the valve control equipment and sub module program of Rudong project, the original program logic of the valve control system equipment and sub module is verified, and the integrity and excellence of the function of the designed test platform are also verified.
王琦, 杨张斌, 彭代晓, 刘小勇. 柔性直流输电阀控及子模块控制全接入试验系统设计[J]. 电气技术, 2022, 23(2): 40-47.
WANG Qi, YANG Zhangbin, PENG Daixiao, LIU Xiaoyong. Design of full access test system for valve control and sub-module control of flexible direct current transmission. Electrical Engineering, 2022, 23(2): 40-47.