电气技术  2019, Vol. 20 Issue (6): 44-49    DOI:
研究与开发 |
基于Apriori算法的气象与电网缺陷关联研究
林卫铭1, 吴泽君1, 周恒旭2, 郭静2
1. 广东今程光一电力科技有限责任公司,广东 佛山 528000;
2. 佛山科学技术学院自动化学院,广东 佛山 528000
Research on mining association between weather and power grid based on Apriori algorithm
Lin Weiming1, Wu Zejun1, Zhou Hengxu2, Guo Jing2
1. Guangdong Jincheng Guangyi Electric Power Technology Co., Ltd, Foshan, Guangdong 528000;
2. Automation College, Foshan University, Foshan, Guangdong 528000