Abstract:For the optimal result of hydro-wind integrated operation is often affected by the prediction accuracy, an optimized hydro-wind integrated operation model based on stochastic programming is proposed in this paper by introducing a random variable as the output power of wind farm. The model is aimed at obtaining the maximum increment of the total generated electricity and the water storage of hydro-plants. The global optimum is calculated by stochastic simulation of particle swarm algorithm. At last, MATLAB software is used to program and get the simulation result, and the result shows that the method proposed in this work is feasible.
李杏, 孙春顺, 陈浩, 李昱, 葛宇轩. 基于随机规划的水风电联合优化运行研究[J]. 电气技术, 2013, 14(04): 29-32.
Li Xing, Sun Chunshun, Chen Hao, Li Yu, Ge Yuxuan. Research on an Optimized Hydro-wind Integrated Operation Model Based on Stochastic Programming. Electrical Engineering, 2013, 14(04): 29-32.