Research on the method of fast batch conversion of coordinates of total station without prism in electric power survey
Wang Qian1, Wang Yantao2
1. State Grid Tianjin Electric Power Corporation Chengxi District Supply Company, Tianjin 300000; 2. China Energy Engineering Group Tianjin Electric Power Design Institute Co., Ltd, Tianjin 300000
Abstract:With the development of measurement technology and the popularization of measurement equipment, prism free total station measurement has been widely used in various stages of power survey and other engineering construction. How to combine it with conventional engineering measurement methods such as global navigation satellite system measurement has become the mainstream technical means in the current power survey work. Based on the practice of electric power survey engineering, this paper studies a method of fast batch conversion of total station coordinates without prism, develops the corresponding data processing tools, realizes one key fast processing from total station coordinates to target coordinates, which greatly improves the work efficiency.
王倩, 王艳涛. 电力勘测中免棱镜全站仪坐标快速批量转换方法研究[J]. 电气技术, 2020, 21(12): 45-48.
Wang Qian, Wang Yantao. Research on the method of fast batch conversion of coordinates of total station without prism in electric power survey. Electrical Engineering, 2020, 21(12): 45-48.