电气技术  2021, Vol. 22 Issue (10): 34-42    DOI:
研究与开发 |
考虑时变备用需求的含大规模风电电力系统机组组合滚动优化
桂前进1, 黄向前1, 麦立2, 徐瑞翔1
1.国网安徽省电力公司安庆供电公司,安徽 安庆 246003;
2.国网安徽省电力有限公司,合肥 230022
Unit commitment rolling optimization of power system with a large-scale wind farm considering time-varying reserve requirement
GUI Qianjin1, HUANG Xiangqian1, MAI Li2, XU Ruixiang1
1. Anqing Power Supply Company, State Grid Anhui Electric Power Co., Ltd, Anqing, Anhui 246003;
2. State Grid Anhui Electric Power Co., Ltd, Hefei 230022