Abstract:The cut tobacco production line, the cigarette package transformer production line with the load coefficient is the lower, running from the whole process of design, analysis, the actual operation of transformer condition, find the main reason. Put forward to strengthen management, improve the accuracy of data acquisition design manual Demand coefficient and synchronous coefficient, flexible scheduling of transformer operation to improve measures load coefficient.