Abstract:The Unit diesel generators, as the core equipment of NPS reliable power supply, is very important to NPS safety. Especially at the stage of post Fukushima stage, realizing of step-by-step loading of the Unit diesel generator under the Unit accident condition play significant role in ensuring the Unit safety. On the basis of practical commissioning and running experience of Stage I,diesel unit loading designwere improved and the step-by-step loading design scheme of Unit 3&4 was proposed. It lays a solid foundation for the smooth construction of Unit 3&4.
王伟, 王绪, 杨世博, 卢峰超, 成方圆. 一起小电流接地系统单相接地故障的分析[J]. 电气技术, 2014, 15(10): 52-54.
Wang Wei, Wang Xu, Yang Shibo, Lu Fengchao, Cheng Fangyuan. Analysis of a Single to Ground Fault in Neutral Unearthed System. Electrical Engineering, 2014, 15(10): 52-54.