Kuitun river 2# Hydropower Station, the Main Electrical Wiring and the Selection of Main Equipment |
Yuan Xiu |
Kuitun Nongqishi Survey Design Institute, Kuitun, Xinjiang 833200 |
|
|
Abstract The 3 power station generator installed 7.5MW(2*3+1*1.5MW), the generator outlet voltage 10.5kV. Generator voltage side connection USES the expanding unit + variable group of connection mode, the expanded unit connection Settings for 10kV wiring 1 straight back and sent to the nearby10kV power supply area. Main transformer high voltage side adopts single bus bar connection mode, power station to send the 35kV voltage grade, 35kV line line 1 loop back to the western suburbs, and NongQiShi grid connection.
|
Published: 23 January 2014
|
|
|
|
Cite this article: |
Yuan Xiu. Kuitun river 2# Hydropower Station, the Main Electrical Wiring and the Selection of Main Equipment[J]. Electrical Engineering, 2013, 14(12): 102-104.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2013/V14/I12/102
|
|
|
|