Impact of Leading Phase Operation of 600MW Generator on System Voltage |
Xue Min, Zheng Huiping, Yang Weiwei |
Shanxi Electric Power Research Institute, Taiyuan 030001 |
|
|
Abstract Due to the power system voltage rising caused by excess reactive power during the valley load, This paper mainly talk about the test on of generator, according to which the system voltage is adjusted to a reasonable extent. Experiment proved that the method is practical and effective.
|
Published: 23 January 2014
|
|
|
|
Cite this article: |
Xue Min,Zheng Huiping,Yang Weiwei. Impact of Leading Phase Operation of 600MW Generator on System Voltage[J]. Electrical Engineering, 2013, 14(12): 81-82.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2013/V14/I12/81
|
[1] 黄纯华. 大型同步发电机运行[M]. 北京: 水利电力出版社, 1992. [2] 大型汽轮发电机技术条件. DL/T 650—1998. [3] 大中型同步发电机励磁系统技术要求. GB 7409-2007. [4] Prabha Kundur. 电力系统稳定与控制[M]. 北京: 中国电力出版社, 2001. [5] 刘取. 电力系统稳定性及发电机励磁控制[M]. 北京:中国电力出版社, 2007. |
|
|
|