Analysis and Improvement Measures of Non-Phase Protection Defect of 500kV Breaker Body |
Wei Xin, Wen Caiquan |
Hebei Electric Power Corporation Maintenance Branch, Shijiazhuang 050070 |
|
|
Abstract When the single to ground fault occurs in neutral unearthed system, the fault point must be found as soon as possible to avoid a phase to phase short. This paper discusses the zero-sequence voltage, zero-sequence current of the system and the power losses and temperature change in fault point. The conclusion is: the zero-sequence voltage make the fault point give out heat which can be detected by Infrared Thermometer,field test performed proves that this method is practical and feasible .
|
Published: 04 November 2014
|
|
|
|
Cite this article: |
Wei Xin,Wen Caiquan. Analysis and Improvement Measures of Non-Phase Protection Defect of 500kV Breaker Body[J]. Electrical Engineering, 2014, 15(10): 103-105.
|
|
|
|