Operation Reliability Analysis of Primary Equipment in UHV DC |
Song Zilin1, Cheng Ling2 |
1. Yibin Ultra High Voltage Administrative Bureau, State Grid Operation Co., Ltd, Yibin, Sichuan 644000; 2. Yibin Power Supply Company, State Grid, Yibin, Sichuan 644000 |
|
|
Abstract When the snow disaster occurred, the double inverter DC lines run in parallel to further increase the current .It has obviously improved the ability of transmission line of melting ice. ±800kV UHV DC engineering equipped with a single pole double 12 pulse inverter series design, which can provide 46 species selection of operation mode, and with functions of inverter cast back online. This module type make UHV DC project has more selective and higher reliability. First of all, by comparing the conventional DC engineering and UHV DC engineering equipment connection mode, the single-pole double 12 pulse inverter running stability was analyzed. Then the ability of melting ice was studied and the reliability of the DC line single-pole double internal fault was analysed. Hope this paper can offer help in single-pole double the 12 pulse inverter application in the future.
|
Published: 02 June 2015
|
|
|
|
[1] 刘振亚. 特高压电网[M]. 北京: 中国经济出版社, 2005. [2] 舒印彪. 中国直流输电的现状及展望[J]. 高电压技术, 2004, 30(11): 1-2, 20. [3] 邰超, 秦松林, 肖登明. 特高压直流输电线下的直流离子流电场[J]. 电气技术, 2012, 3(3): 6-9. [4] 舒印彪, 刘泽洪, 高理迎, 等. ±800kV 6400MW特高压直流输电工程设计[J]. 电网技术, 2006, 30(1): 1-8. [5] 周锋. 均压环对覆冰特高压直流复合绝缘子电场分布的影响[J]. 电气技术, 2011(12): 24-27. [6] 范建斌, 于永清, 刘泽洪, 等. ±800kV特高压直流输电标准体系的建立[J]. 电网技术, 2006, 30(14): 1-6. [7] 岳丽霖, 连美霞. ±800kV奉贤换流站的结构与功能特点[J]. 电气技术, 2011(12): 113-115. |
|
|
|