Based on ± 500kV GIS Equipment Safety of Niuzhai Converter Station Measures Design and Research |
Cao Xianwu, Zhou Yashu, Wang Dianchu, Liu Baishuang |
Qujing Bureau, CSG EHV Transmission Company, Qujing, Yunnan 655000 |
|
|
Abstract Combined Niuzhai converter station 3/2 wiring GIS equipment, The study of GIS equipment maintenance operations under different wiring, electrical inspection, grounding, job security measures and the installation of hanging nameplate cover fences guarantee how to achieve job security arrangement, the power range minimum, optimum ergonomics and simple, convenient and practical and effective. By standardizing device operations to determine indirect electrical inspection measures to optimize the signage and masking arrangement, which was the scene of a security risk, and ultimately standardize safety measures design. After the application of research results niu zhai for other equipment flow inside the station, and through field practice and verify continuous improvement, which was extended to other converter station or substation, and ultimately achieve the set of safety measures arranged method can be applied to different commutation station, substation equipment different wiring maintenance purposes.
|
Published: 22 March 2016
|
|
|
|
Cite this article: |
Cao Xianwu,Zhou Yashu,Wang Dianchu等. Based on ± 500kV GIS Equipment Safety of Niuzhai Converter Station Measures Design and Research[J]. Electrical Engineering, 2016, 17(3): 111-115.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2016/V17/I3/111
|
[1] 赵畹君. 高压直流输电工程技术[M]. 北京: 中国电力出版社, 2004. [2] 高压直流输电现场实用技术问答[M].北京: 中国电力出版社, 2008. [3] ±500kV直流换流站运行技术[M]. 北京: 中国电力出版社, 2011. [4] 严璋, 朱德恒. 高电压绝缘技术[M]. 北京: 中国电力出版社, 2002. [5] 林莘. 现代高压电器技术[M]. 北京: 机械工业出版社, 2002. |
|
|
|