Optimization of Distribution Network Reconstruction Project based on the Analysis of Urgency |
Chen Hai |
State Grid Tongxiang Power Supply Company, Tongxiang, Zhejiang 314500 |
|
|
Abstract Power distribution network is to meet the growing demand for power supply, but its development is limited by the amount of capital, operating force and other factors, there is a problem of merit. According to the actual situation of distribution network operation, this paper puts forward the concept of project urgency analysis, and takes the urgency of improving the objective function and the project investment not to exceed approval as the constraint condition to construct the project decision assistant decision model. The urgency calculation is based on the improved analytic hierarchy process. Examples show that the results of the research can ensure the use of the limited funds in the distribution network, and the power supply reliability and power quality can be improved steadily.
|
Received: 22 September 2016
Published: 22 September 2016
|
|
|
|
Cite this article: |
Chen Hai. Optimization of Distribution Network Reconstruction Project based on the Analysis of Urgency[J]. Electrical Engineering, 2016, 17(9): 26-29.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2016/V17/I9/26
|
[1] 张弛, 程浩忠, 奚珣, 等. 基于层次分析和模糊综合评价法的配电网供电模式选型[J]. 电网技术, 2006, 30(22): 67-71. [2] 肖峻, 王成山, 周敏. 基于区间层次分析法的城市电网规划综合评判决策[J]. 中国电机工程学报, 2004, 24(4): 50-57. [3] 赵会茹, 王鹤, 韩英豪, 等. 电网建设项目投资优化及辅助决策支持系统研究[J]. 华东电力, 2007, 35(6): 23-25. [4] 肖峻, 高海霞, 葛少云, 等. 城市中压配电网评估方法与实例研究[J]. 电网技术, 2005, 29(20): 77-81. [5] 王文山. 电网建设项目投资决策评价[J]. 电网技术, 2007, 2(S2): 90-92. |
|
|
|