Study on the Main Electrical Connection Optimization of Smart Substation based on Coordination between Power Grid and Substation |
Huang Yangqi1, Liu Nian1, Zhang Jianhua1, Qin Xiaohui2 |
1. School of Electrical and Electronic Engineering, North China Electric Power University, Beijing 102206; 2. Power System Department,Electric Power Research Institute, Beijing 100192 |
|
|
Abstract With the construction of smart grid and smart substation, influences of the main electrical connection on the reliability of the entire power gird have become more and more important. Therefore, coordinated development between power grid and substation is a key to the design and optimization of main electrical connection. In this paper, the entire equipment in power grid including the main electrical connection is simulated simultaneously, and then the indexes of power gird with the main electrical connection optimization by disconnecting circuit breaker are calculated. Optimization schemes are sorted by the method of TOPSIS, realizing the evaluation of main electrical connection based on coordinated development between power grid and substation.
|
Published: 20 April 2015
|
|
|
|
Cite this article: |
Huang Yangqi,Liu Nian,Zhang Jianhua等. Study on the Main Electrical Connection Optimization of Smart Substation based on Coordination between Power Grid and Substation[J]. Electrical Engineering, 2015, 16(04): 1-5.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2015/V16/I04/1
|
[1] Sidiropoulos M. Determination of substation models for composite system reliability evaluation [C]. Proceedings of the Power Engineering Society General Meeting, 2007 IEEE, 24-28 June2007, 2007. [2] 束洪春, 胡泽江, 张静芳, 等. ±800 kV换流站主接线可靠性评估[J]. 电力系统自动化, 2008, 32(19): 35-39, 91. [3] Cheng-Chien K, Fu-Hsien C. Evaluation of substation bus schemes considering reliability[C]. proceedings of the Machine Learning and Cybernetics(ICMLC), 2010 International Conference on, 11-14 July 2010, 2010. [4] 宋璇坤, 李敬如, 肖智宏, 等. 新一代智能变电站整体设计方案[J]. 电力建设, 2012, 33(11): 1-6. [5] 彭鹄, 田娟娟, 陈燕, 等. 重庆大石220kV新一代智能变电站优化设计[J]. 电力建设, 2013, 34(7): 30-36. [6] 刘祖永, 严启明, 王小波, 等. 隔离式断路器在智能变电站中的应用[J]. 湖北电力, 2013, 37(3): 1-3. [7] 易海琼, 兑潇玮, 李勇. 基于隔离式断路器的智能变电站电气主接线优化[J]. 电力建设, 2014, 35(6): 92-96. [8] 王勇, 韩学山, 丁颖. 计及站内接线的电网可靠性评估的蒙特卡罗方法[J]. 电力系统保护与控制, 2012, 40(5): 53-58. [9] 王勇. 电力系统运行可靠性分析与评价理论研究[D]. 济南: 山东大学, 2012. [10] 储俊杰. 变电所一次主接线电气连通性分析的数学模型[J]. 电力系统自动化, 2003, 27(1): 31-33, 48. [11] 何飞, 梅生伟, 薛安成, 等. 基于直流潮流的电力系统停电分布及自组织临界性分析[J]. 电网技术, 2006, 30(14): 7-12. [12] 曹一家, 丁理杰, 王光增, 等. 考虑网络演化的直流潮流停电模型与自组织临界性分析[J]. 电力系统自动化, 2009, 33(5): 1-6. [13] 顾基发. 多目标决策问题[J]. 自然杂志, 1980, 3(2): 34-37. [14] 宋海洲. 基于相对目标接近度的多目标决策方法及其应用[J]. 数学的实践与认识, 2004, 34(5): 30-36. [15] Billinton R, Kumar S, Chowdhury N, et al. A reliability test system for educational purposes-basic data[J]. Power Systems, IEEE Transactions on, 1989, 4(3): 1238-1244. [16] Subcommittee M P. IEEE reliability test system[J]. Trans.on Power Apparatus and System, IEEE, 1979, 98(6): 2047-2054. [17] Billinton R, Vohra P K, Kumar S. Effect of station originated outages in a composite system adequacy evaluation of the IEEE reliability test system[J]. Power Engineering Review, IEEE, 1985, PER-5(10): 25-26. |
|
|
|