Research on Security Isolation Scheme of Equipments Energized Partly in the UHVDC Project Converter Station |
Jia Xuantao,Yan Bing,Wang Yatao,Ai Hongjie,Xiong Fei |
XJ Electric Corp., Ltd, Xuchang, He’nan 461000 |
|
|
Abstract As soon as possible in order to play the UHVDC project economic benefits during the project construction period, equipments are energized and put into service partly in different stage, so there are operating and testing equipments in the same time at site, it’s dangerous and adverse for the project under construction.Based on the Jin-Su UHVDC project Suzhou station, this paper studies the security isolation scheme deeply, after the actual verification, to prove the safety isolation schemes are effective, and worthy of further promotion in other UHVDC projects.
|
Published: 19 May 2015
|
|
|
|
Cite this article: |
Jia Xuantao,Yan Bing,Wang Yatao等. Research on Security Isolation Scheme of Equipments Energized Partly in the UHVDC Project Converter Station[J]. Electrical Engineering, 2015, 16(05): 89-94.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2015/V16/I05/89
|
[1] 石岩, 张民, 赵大平. 特高压直流工程二次系统成套设计方案及其特点[J]. 电网技术, 2008, 32(21): 1-5. [2] 王徭. 特高压直流输电控制与保护技术的研究[J]. 电力系统保护与控制, 2009, 37(15): 53-58. [3] 贾轩涛, 严兵, 张爱玲, 等. 锦屏—苏南±800kV特高压直流工程交流滤波器投入异常分析和应对措施 . 电力建设, 2013, 34(3): 92-97. [4] 罗磊, 盛琰, 王清坚, 等. 特高压直流输电系统顺序控制的研究[J]. 电力系统保护与控制, 2011, 39(23): 30-33, 38. [5] 刘耀, 王明新. 高压直流输电系统保护装置冗余配置的可靠性分析[J]. 电网技术, 2008, 32(5): 51-54. [6] 戴国安, 周君文, 王亚非. 特高压直流无功控制策略研究[J]. 电力系统保护与控制, 2008, 36(14): 48-51. [7] 张望, 郝俊芳, 曹森, 等. 直流输电换流站无功功率控制功能设计[J]. 电力系统保护与控制, 2009, 37(14): 72-76. [8] 李延龙, 杨亚璞, 李楠. 高压直流输电控制保护系统的冗余可靠性研究[J]. 电力系统保护与控制, 2009, 37(16): 59-62. [9] 张望, 黄利军, 郝俊芳, 等. 高压直流输电控制保护系统的冗余设计[J]. 电力系统保护与控制, 2009, 37(13): 88-91. |
|
|
|