Process Optimum on the Modification of Integrated Substation Automation System |
Zhong Wei1, Huang Guifeng2, Liu Qi1 |
1. The Sichuan Ziyang Power Supply Company, Ziyang, Sichuan 641300; 2. Ziyang Sunshine Power Design Company, Ziyang, Sichuan 641300 |
|
|
Abstract In view of the contradiction between equipment outage time and construction time in the modification of integrated substation automation system, it be put out on the modification process that the work can’t need power outage or the work can’t need power outage by taking appropriate measures will be completed before or after power outage. And it can reduce the workload during the outage. An example of a 110kV substation integrated automation system modification is lifted to indicate the application process of this scheme, and to evaluate the received effect by using this scheme.
|
Published: 20 July 2015
|
|
|
|
Cite this article: |
Zhong Wei,Huang Guifeng,Liu Qi. Process Optimum on the Modification of Integrated Substation Automation System[J]. Electrical Engineering, 2015, 16(07): 129-131.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2015/V16/I07/129
|
[1] 张怡. 数字化变电站综合自动化系统改造要点分析[J]. 科技资讯, 2011(21): 130-131. [2] 霍建彬, 吴国沛, 黄欣. 运行中的500kV变电站综合自动化系统改造[J]. 电力系统保护与控制, 2010(6): 133-136, 145. [3] 张颖耀. 110kV变电站综合自动化系统改造的研究[J]. 中小企业管理与科技, 2013(21): 310-311. [4] 张耀天. 变电站保护及综自改造优化方案讨论——基于关联度重要度分析[J]. 现代商贸工业, 2011, 23(22): 335-335. |
|
|
|