Analysis of Burned Snubber Circuit in GE LS2100e System |
Wang Zhengyuan1, Wu Pengyue2 |
1. Huaneng Tianjin IGCC Company Limited, Tianjin 300452; 2. Xi’an Thermal Power Research Institute,Xi’an 710032 |
|
|
Abstract In this article, sunbber circuit of the load power cabinet in the GE Company’s LS2100e system is burned as an opportunity, introduced the overview and principle of the power cabinet, and analyzed the function of each Board in the power cabinet. Through the analysis of the current process variables when a fault occurred, the fault range locked. Combined the function of each Board in the power cabinet, in-depth analysis of the thyristor cell, confirmed the possible fault causes. Finally, put forward to the views and maintenance of LS2100e system.
|
Received: 18 August 2015
Published: 18 August 2015
|
|
|
|
[1] 李志刚. 9F燃气轮机LS2100e起动系统及起动过程简介[J]. 燃气轮机技术, 2005,18(2): 57-61. [2] GEI-100224, Static Starter Control High Voltage Gate Board DS200FHVAG1A. [3] GEI-100222, Static Starter Control Current Sensor Interface Board DS200FCSAG1A. [4] GEI-100225, Static Starter Control Voltage Feedback Scaling Board DS200NATOG1A. [5] GEI-100223, Static Starter Control Gate Pulse Amplifier Board DS200FGPA. [6] 王兆安, 黄俊. 电力电子技术[M]. 北京: 机械工业出版社, 2008. [7] 姜栋栋, 王烨, 卢峰. IGBT过电压产生机理分析及RC缓冲电路的设计[J]. 电力科学与工程, 2011, 27(4): 23-29. [8] 吴书泉. GE 9FA燃气—蒸汽联合循环发电机组LCI变频起动装置研究及运用[D]. 杭州: 浙江大学, 2009. [9] 马铁军, 傅煜. 阻容吸收回路放电电阻过热原因分析及处理[J]. 中国电力, 2010, 43(11): 92-95. |
|
|
|