Abstract The normal operation of high-voltage DC transmission project is related to of the State of Electrode line(EL), EL is not only used in the conduction current, also in the metal loop -Ground loop transformation plays an important role.this paper intrduced two technolygy generally used in impedance monitoring of HVDC transmission project:impendence method and time domain difference method(DTDR). Take xiluodu-zhejiang project and Nuozhadu project as an example, this paper respectively expounds the principle of two kinds of technology, in the practical engineering application, and the advantages and disadvantages of each.
|
Published: 28 September 2015
|
|
|
|
Cite this article: |
Ai Hongjie,Li Junxia,Jia Xuantao等. The Analysis of Electrode Line Supervision Technology in HVDC Project[J]. Electrical Engineering, 2015, 16(9): 109-111.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2015/V16/I9/109
|
[1] 王磊. PEMO2000接地极线监测特性分析[J]. 电力建设, 2008, 29(8): 41-43. [2] 刘贯科. HVDC系统接地极引线故障检测方法的研究[Z]. 2013. [3] 贾轩涛, 严兵, 张爱玲, 等. 锦屏—苏南±800 kV特高压直流工程交流滤波器投入异常分析和应对措施[J]. 电力建设, 2013, 34(3): 92-97. [4] 姚进波, 贾轩涛, 周玉勇, 等. 特高压工程DCC800直流保护与控制配合逻辑分析[J]. 南方电网技术, 2013, 7(4): 78-82. [5] 刘耀, 王明新. 高压直流输电系统保护装置冗余配置的可靠性分析[J]. 电网技术, 2008, 32(5): 51-54, 65. [6] 戴国安, 周君文, 王亚非. 特高压直流无功控制策略研究[J]. 电力系统保护与控制, 2008, 36(14): 48-51. [7] 张望, 郝俊芳, 曹森, 等. 直流输电换流站无功功率控制功能设计[J]. 电力系统保护与控制, 2009, 37(14): 72-76. [8] 李延龙, 杨亚璞, 李楠. 高压直流输电控制保护系统的冗余可靠性研究[J]. 电力系统保护与控制, 2009, 37(16): 59-62. [9] 张望, 黄利军, 郝俊芳, 等. 高压直流输电控制保护系统的冗余设计[J]. 电力系统保护与控制, 2009, 37(13): 88-91. |
|
|
|