Design and Implementation of Real-time Load Recording for Traction Power Supply based on IEC 60870-5-103 Protocol Extension |
Li Peng, Fan Sanlong |
Nanjing SAC Railway & Track Traffic Engineering Co., Ltd, Nanjing 210032 |
|
|
Abstract The common integrated traction substation automation system can not satisfy the needs of high-precision real-time load recording, an implementation scenario based on IEC 60870-5-103 protocol extension is introduced by this article. Also the key processes of the scenario, such as real-time transmission of telemeter with accurate time, data sample & dynamic compression, and data storage mode in station control layer are illuminated. The implementation scenario has been successfully applied to several traction substation automation systems and proved to be feasible and highly effective.
|
Published: 28 October 2015
|
|
|
|
Cite this article: |
Li Peng,Fan Sanlong. Design and Implementation of Real-time Load Recording for Traction Power Supply based on IEC 60870-5-103 Protocol Extension[J]. Electrical Engineering, 2015, 16(10): 117-119.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2015/V16/I10/117
|
[1] 郭志. 地铁直流牵引系统负荷监测系统[J]. 工业控制计算机, 2008, 21(7): 29-30. [2] 陈小川, 贺威俊, 王牣, 等. 电力牵引网故障测距与录波微机综合系统[J]. 电力系统自动化, 1996, 20(4): 5-8, 15. [3] 赵丽平, 李群湛, 陈小川. IEC 870-5-103规约在牵引变电所自动化系统中的应用[J]. 电力系统及其自动化学报, 2003, 15(3): 88-92. [4] IEC 60870-5-103. Telecontrol Equipment and Systems Part5: Transmission Protocols Section 103 Companion Standard for the Information Interface of Protection Equipment [S]. [5] DL/T 667—1999. 远动设备及系统第5部分传输规约第103篇继电保护设备信息接口配套标准[S]. [6] 刘毅, 周雒维, 冯浩. 电能质量监测网录波数据压缩方法[J]. 电网技术, 2010, 34(4): 199-203. |
|
|
|