The Review on Install Equipment Development of Outdoor High Voltage Disconnector’s Operating Mechanism |
Zhang Zhifu, Jin Jiajie, Hong Yunfeng, Wang Sichang, Bai Tianyu |
Wuhu Power Supply Company, Wuhu 241000 |
|
|
Abstract The field installation of outdoor high-voltage disconnectors is an important part during substation new construction, reconstruction or extension project, involving rated voltages of 110kV and above. And the localization of its operating mechanism installment is difficult, time-consuming and unsafe. The purpose of this paper is to review the globe status of operating mechanism install equipment, explore the factors affecting the operating mechanism installation, refine academic and engineering problems, and propose ideas for future research and development. Meanwhile, suggestions for further research are proposed form the author’s point of view, offering reference for readers.
|
Published: 20 November 2015
|
|
|
|
Cite this article: |
Zhang Zhifu,Jin Jiajie,Hong Yunfeng等. The Review on Install Equipment Development of Outdoor High Voltage Disconnector’s Operating Mechanism[J]. Electrical Engineering, 2015, 16(11): 94-96.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2015/V16/I11/94
|
[1] Q/CSG 11105.2—2008. 南方电网工程施工工艺控制规范[S]. [2] GBJ 147—1990. 电气装置安装工程高压电器施工及验收规范[S]. [3] 盛明学, 王志清. 户外高压隔离开关常见故障的原因分析与处理[J]. 高压电器, 2010, 46(10): 93-96. [4] 孙宁. 户外高压隔离开关电动机构箱安装专用工具研制[J]. 高压电器, 2011, 47(7): 76-79. [5] 陈显辉, 雷欢. 大型隔离开关操作机构安装平台的研制[J]. 机电信息, 2013(27): 132-133. [6] 魏忠明, 尹志. 隔离开关操作平台找正的施工方法比较[J]. 云南电力技术, 2006, 34(2): 50-51. [7] 李晓武. GW系列隔离开关垂直连杆安装工艺改进[J]. 湖南电力, 2005, 25(2): 49-50. |
|
|
|