Electrical Engineering  2016, Vol. 17 Issue (5): 26-30    DOI:
Research & Development Current Issue| Next Issue| Archive| Adv Search |
Capacity Optimization and Configuration for Building Wind/PV/Storage Hybrid Power Generation System
Lin Shiyu1, Weng Guiping2
1. Fuzhou Powersource Technology Development Co., Ltd, Fuzhou 350008;
2. College of Electrical Engineering and Automation, Fuzhou University, Fuzhou 350116

Copyright © Electrical Engineering
Supported by: Beijing Magtech