Electrical Engineering
2013
,
Vol. 14
Issue (08)
: 105-107
DOI
:
Current Issue
|
Next Issue
|
Archive
|
Adv Search
|
Abstract
Figure/Table
References
Related Citation (15)
Download:
PDF
(425 KB)
HTML
(1 KB)
Export:
BibTeX
|
EndNote
(RIS)
Published:
10 October 2013
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Cite this article:
URL:
http://dqjs.cesmedia.cn/EN/Y2013/V14/I08/105
[1] 张洪明, 廖培鸿, 任年荣, 等. 城市高压网络简化接线模式探讨[J]. 中国电力, 1995, 28(8): 17-20.
[2] 陈文高. 配电系统可靠性实用基础[M]. 北京: 中国电力出版社, 1998.
[3] 葛少云, 郭明星, 王成山, 等. 城市高压配电网接线模式比较研究[J]. 电力自动化设备, 2004, 24(2): 33-37.
[1]
Cheng Huaihao, Chen Tao.
A new method of gas insulated switchgear equipment extension based on large caliber installing hand hole
[J]. Electrical Engineering, 2019, 20(11): 88-92.
Copyright © Electrical Engineering
Supported by: Beijing Magtech