Electrical Engineering  2016, Vol. 17 Issue (9): 98-100    DOI:
Technology & Application Current Issue| Next Issue| Archive| Adv Search |
Research on Factory Test Automatic Control System of Electrical Penetration Assemblies for Nuclear Power Station
Shen Zhihua1, Yu Jiwei2, Guo He1, Shi Shenhua1, Zhu Lin1
1. Shanghai Power Equipment Research Institute, Shanghai 200240;
2. China Nuclear Power Engineering Co., Ltd, Shenzhen, Guangdong 518124

Copyright © Electrical Engineering
Supported by: Beijing Magtech