Electrical Engineering  2016, Vol. 17 Issue (10): 31-35    DOI:
Research & Development Current Issue| Next Issue| Archive| Adv Search |
Bushing PD Analysis and Electric Field Simulation Large Capacity Synchronous Compensator
Wang Xiao1, Zhou Ping1, Wang Yang1, Li Zhiqiang2
1. DFEM Control Equipment Co., Ltd, Deyang, Sichuan 618000;
2. China Electric Power Research Institute, Beijing 100192

Download: PDF (10439 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  This paper introduces the principles of static frequency converter (SFC) start-up mode,compares the two starting schemes,analyzes the relationship between SFC capacity and starting time by modeling and simulation.The research shows that the two schemes have their advantages and disadvantages, which can meet the requirements of the starting of the synchronous compensator.
Key wordssynchronous compensator      SFC      starting circuit      starting process     
Published: 26 October 2016
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Wang Xiao
Zhou Ping
Wang Yang
Li Zhiqiang
Cite this article:   
Wang Xiao,Zhou Ping,Wang Yang等. Bushing PD Analysis and Electric Field Simulation Large Capacity Synchronous Compensator[J]. Electrical Engineering, 2016, 17(10): 31-35.
URL:  
https://dqjs.cesmedia.cn/EN/Y2016/V17/I10/31
Copyright © Electrical Engineering
Supported by: Beijing Magtech