In V Connection of Current Transformer Installation Phase Selection |
Yan Yingzhou |
Henan Branch of Aluminum Corporation of China, Zhengzhou 450041 |
|
|
Abstract This paper introduces the present enterprise 6~10kV power grid commonly used current protection of star connection mode, a detailed analysis of the current transformer V connection, in different failure forms, the protection of the combination of action, and points out that the V current protection mode of connection is 6~10kV power grid enterprise first choice, but to install the corresponding have strict requirements, must be two same phase.
|
Published: 26 June 2014
|
|
|
|
|
|
|