The Method and Practice of Replacing Duplex V-String Composite Insulators for ±800kV Tangent Tower under Live Working |
Xiang Yun, Chen Jianping, Liu Zhiguo, Zhang Shu, Yi Ziqi |
Live Working Center of State Grid Corporation of Hu’nan, Changsha 410010 |
|
|
Abstract The replacement of UHV line insulator under live working is very difficult because of its high loading. This paper takes the replacing duplex V-String composite insulators for ±800kV tangent tower under live working for example, using hanging basket to enter into equal potential is determined by analyzing the safety distance and combined gap. According to the insulator mechanical characteristics, the replacement tool for duplex V-String composite insulators is designed including hydraulic tightener, insulation pull rods, hand tighten screw and thread fastener. And the intensity of each part is checked, through small scale tests and pilot tests, prove its reliability and veracity, and can effectively improve the working efficiency.
|
Published: 23 May 2017
|
|
|
|
Cite this article: |
Xiang Yun,Chen Jianping,Liu Zhiguo等. The Method and Practice of Replacing Duplex V-String Composite Insulators for ±800kV Tangent Tower under Live Working[J]. Electrical Engineering, 2017, 18(5): 136-139.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2017/V18/I5/136
|
[1] 胡毅, 刘凯, 彭勇, 等. 带电作业关键技术研究进展与趋势[J]. 高电压技术, 2014, 40(7): 1921-1931. [2] 胡毅. 输配电线路带电作业技术的研究与发展[J]. 高电压技术, 2006, 32(11): 1-10. [3] 胡毅, 刘凯, 刘庭, 等. 超/特高压交直流输电线路带电作业[J]. 高电压技术, 2012, 38(8): 1809-1820. [4] 胡毅, 刘凯, 刘庭, 等. 带电作业技术研究与标准制定[J]. 高电压技术, 2012, 38(11): 3015-3024. [5] 李如虎, 吴正树, 陆文叁. 带电更换±800kV楚穗线绝缘子力的计算及工具选择[J]. 广西电力, 2014, 37(4): 57-59, 62. [6] 郭栋, 申丽馨. 浅谈特高压输电线路光缆金具更换支架在带电作业中的应用[J]. 科技风, 2014(16): 56-56. [7] 杨莹, 童庆望, 曾忱, 等. ±800kV特高压输电线路带电作业更换耐张硬管母跳线绝缘子工艺方法研究[J]. 湖北电力, 2015, 39(4): 45-46, 54. [8] 国家电网公司. DW 302—2009. ±800kV直流输电线路带电作业技术导则[S]. 2009. |
|
|
|