The Study of the Main Electrical Connection Betterment in a 220kV Large Open-type Substation |
Zhang Na, Jiang Jian, Li Juze, Zhou Jianjun |
Guangzhou Power Supply Co., Guangzhou 510245 |
|
|
Abstract Achieving the betterment which exceeds the size of the feasibility study without land acquisition and realizing the goal with safety and without power cut, are the difficulties of the main electrical connection betterment of a 220kV large open-type substation. In this article, by analysis of the betterment of a 220kV key substation which changed double-bus type connection to sectionalized double-bus type connection, we provide technical guidance to solve the problems and realize the goal.
|
Published: 28 June 2017
|
|
|
|
Cite this article: |
Zhang Na,Jiang Jian,Li Juze等. The Study of the Main Electrical Connection Betterment in a 220kV Large Open-type Substation[J]. Electrical Engineering, 2017, 18(6): 132-135.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2017/V18/I6/132
|
[1] 于光远. 山东济南电网220kV变电站运行条件下的大规模改造[D]. 上海: 上海交通大学, 2011. [2] 孙立新, 孙华. 常规变电站智能化改造工程施工技巧[J]. 电气技术, 2013, 14(7): 99-102. [3] 钟炜, 黄贵凤, 刘琦. 变电站综合自动化系统改造过程优化[J]. 电气技术, 2015, 16(7): 129-131. [4] 忻国胜, 王敏. 220kV城市旧变电站的改建新思路[J]. 华东电力, 2007(1): 45-47. [5] 丁浩寅, 邰能灵, 崔新奇, 等. 大型超高压变电站运行条件下的电气改造方案[J]. 电力自动化设备, 2010(9): 132-137. [6] 刘宝童. 关于超高压变电站不停电改造技术探讨[J]. 电子世界, 2012(23): 43-45. [7] 陈戌生, 张惠勤. 电力工程设计手册[M]. 北京: 中国电力出版社, 1989. [8] 徐小宁. 变电站主接线方式可靠性评估与方案优选[J]. 电工技术学报, 2015, 30(12): 441-446. [9] 姚莉娜, 张军利, 刘华, 等. 城市中压配电网典型接线方式分析[J]. 电力自动化设备, 2006, 26(7): 26-29. [10] 李芳红. 220kV变电站高、中压侧母线最佳接线方式探讨[J]. 广东电力, 2008(2): 48-51. [11] 陈珏, 房岭锋. 现有超高压变电站高型构架的改造[J]. 供用电, 2004(2): 41, 44. |
|
|
|