Analysis and Experiment on Parallel Operation of Transformer with Capacity Over 3 Times |
Wu Yonjie, Li Feng, Liu Jiange |
Jiangsu Lianshui Power Supply Company, Huaian, Jiangsu 223400 |
|
|
Abstract This paper analysis of two transformer wiring group, the ratio is not the parallel operation of circulating current, impedance voltage and load distribution of parallel operation. According to the parameters of the 35kV transformer of 20MVA and 6.3MVA in two substations, the impedance voltage deviation and the load distribution in parallel operation are calculated. Through field test verified the transformer capacity of more than 3 times, in the same ratio, meet the wiring group and impedance voltage deviation under the condition of parallel operation.
|
Published: 20 July 2017
|
|
|
|
Cite this article: |
Wu Yonjie,Li Feng,Liu Jiange. Analysis and Experiment on Parallel Operation of Transformer with Capacity Over 3 Times[J]. Electrical Engineering, 2017, 18(7): 69-72.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2017/V18/I7/69
|
[1] 胡景生. 电力变压器经济运行[M]. 北京: 中国电力出版社, 1999. [2] DL/T 572—2010. 电力变压器运行规程[S] [3] 国家电网公司. 110(66)kV-500kV油浸式变压器(电抗器)运行规程[Z]. 国家电网生技[2005]172号. [4] 陈清鹤, 郭晓芳, 林捷. 差异参数的220kV有载调压变压器并列运行分析[J]. 电气技术, 2015, 16(2): 101-102, 131. [5] 刘照林. 不等容量变压器并列运行条件与经济运行方式的确定方法[J]. 山西电力, 2013(4): 40-43. [6] 赵颖博. 110kV新野变两台主变并列运行可行性分析[J]. 电气技术, 2013, 14(1): 81-83. [7] 黄明华, 李红, 伏祥运, 等. 参数不同变压器并列运行时负荷分配计算[J]. 江苏电机工程, 2012, 31(1): 52-55. |
|
|
|