The Analysis on 500kV Bus-differential Protection Latch of a Substation because of TA Break |
Feng Shun, Qu Xin, Wang Yi, Ge Linzhao, Chen Sisi |
State Gird He’nan Electric Power Conporation Maintenance Company Operation, Zhengzhou 450000 |
|
|
Abstract The bus-differential protection of a 500kV 3/2 connection substation reported 5053 circuit breaker branch TA break, check found to be due to 5053 circuit breaker branch three-phase current imbalance caused by the zero sequence current to meet the bus protection TA off Line logic criterion. The main circuit of the 5053 circuit breaker branch circuit A-phase main circuit isolation switch contact resistance is too large, resulting in 5053 circuit breaker three-phase main circuit resistance imbalance, resulting in the 3/2 system zero sequence circulation. The simulation of the zero sequence circulation generated by 3/2 system of 3-phase main circuit resistance imbalance of 5053 circuit breaker is simulated by Simulink model. It is also reminded to pay attention to the unbalance of the three-phase resistance in the maintenance test deviation.
|
Published: 20 July 2017
|
|
|
|
Cite this article: |
Feng Shun,Qu Xin,Wang Yi等. The Analysis on 500kV Bus-differential Protection Latch of a Substation because of TA Break[J]. Electrical Engineering, 2017, 18(7): 113-116.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2017/V18/I7/113
|
[1] 张永伍, 刘涛, 宋文庆. 某变电站母差保护TA不平衡告警分析[J]. 电力系统及其自动化学报, 2011, 23(5): 147-150. [2] 于群, 曹娜. Matlab/Simulink电力系统建模与仿真[M]. 北京: 机械工业出版社, 2011. [3] 江苏省电力公司. 电力系统继电保护原理与实用技术[M]. 北京: 中国电力出版社, 2006. [4] 郝宏亮, 孙忠文, 徐建军, 等. 一起压变柜爆炸导致主变保护动作的事故分析[J]. 电气技术, 2016, 17(2): 133-135. [5] 曲晓峰. 某500kV主变压器直阻异常故障分析处理[J]. 电气技术, 2016, 17(2): 136-138. |
|
|
|