Research on Comprehensive Evaluation Strategy of Power Transmission Project Planning |
Jin Peng |
Neijiang Power Supply Company, Neijiang, Sichuan 641100 |
|
|
Abstract The rationality of the project is closely related to the economic benefits and the final operation results of the whole project. How to improve the comprehensive performance of the project and improve the planning level of the project is the key point of the power construction enterprise. In this paper, analytic hierarchy process (AHP) and entropy weight method are used to analyze and evaluate the factors that affect the effect of project planning, and the fuzzy comprehensive evaluation is used to evaluate the effect of the project. In view of the actual project of different programs were analyzed and evaluated, and finally identified the most scientific construction program, the transmission project planning has certain reference significance.
|
Published: 06 December 2017
|
|
|
|
[1] 欧阳武, 程浩忠, 张秀彬, 等. 城市中压配电网最大供电能力评价方法[J]. 高电压技术, 2009, 35(2): 403-407. [2] 杨博, 赵娟, 唐玮, 等. 基于层次分析法的电网科技项目综合评价方法研究[J]. 电气技术, 2017, 18(4): 90-94. [3] 李欣然, 彭国荣, 朱湘有, 等. 配电网建设规模模糊综合评价方法[J]. 电力系统及其自动化学报, 2008, 20(6): 70-77. [4] 张建华, 曾博, 张玉莹, 等. 主动配电网规划关键问题与研究展望[J]. 电工技术学报, 2014, 29(2): 13-23. [5] 严艺芬, 吴文宣, 张逸. 主动配电网规划关键问题研究[J]. 电气技术, 2016, 17(11): 1-5, 20. [6] 熊威, 戴爱英, 杨卫红, 等. 天津电网发展与经济发展协调性分析[J]. 电力建设, 2010, 31(7): 41-45. [7] 丁明, 过羿, 张晶晶, 等. 基于效用风险熵权模糊综合评判的复杂电网节点脆弱性评估[J]. 电工技术学报, 2015, 30(3): 214-223. [8] 朱旭凯, 刘文颖, 杨以涵. 综合考虑可靠件因素的电网规划新方法[J]. 电网技术, 2004, 28(21): 51-54. [9] 倪春华. 220kV变电站供电能力评价方案在电网规划前期管理信息系统的应用[J]. 华东电力, 2007, 35(12): 70-72. [10] 伍力, 吴捷, 周乐荣. 输变电工程项目的模糊多目标综合评判决策[J]. 电网技术, 1999, 23(3): 19-22. |
|
|
|