Electrical Engineering  2017, Vol. 18 Issue (11): 55-58    DOI:
Research & Development Current Issue| Next Issue| Archive| Adv Search |
Research on Comprehensive Evaluation Strategy of Power Transmission Project Planning
Jin Peng
Neijiang Power Supply Company, Neijiang, Sichuan 641100

Download: PDF (267 KB)   HTML (0 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  The rationality of the project is closely related to the economic benefits and the final operation results of the whole project. How to improve the comprehensive performance of the project and improve the planning level of the project is the key point of the power construction enterprise. In this paper, analytic hierarchy process (AHP) and entropy weight method are used to analyze and evaluate the factors that affect the effect of project planning, and the fuzzy comprehensive evaluation is used to evaluate the effect of the project. In view of the actual project of different programs were analyzed and evaluated, and finally identified the most scientific construction program, the transmission project planning has certain reference significance.
Key wordspower transmission project      project planning      comprehensive evaluation     
Published: 06 December 2017
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Jin Peng
Cite this article:   
Jin Peng. Research on Comprehensive Evaluation Strategy of Power Transmission Project Planning[J]. Electrical Engineering, 2017, 18(11): 55-58.
URL:  
https://dqjs.cesmedia.cn/EN/Y2017/V18/I11/55
Copyright © Electrical Engineering
Supported by: Beijing Magtech