Research on risk assessment of power grid operation based on matter-element extension |
Zhou Haoqi1, Yu Yunchuan1, Gao Yinxia2 |
1. China Energy Construction Group Jiangsu Power Design Institute Co., Ltd, Nanjing 211102; 2. Jiangsu Keneng Power Engineering Consulting Co., Ltd, Nanjing 211106 |
|
|
Abstract With the rapid growth of social demand for electricity, power grid operation is an important barrier to ensure the safe and stable operation of the power grid. In order to evaluate the operation status of the power grid, the main factors affecting the operation risk of the power grid are firstly identified, an evaluation index system including structure, equipment, management and environmental factors is constructed, the weight of each index is calculated by interval analytic hierarchy process, and then an operation risk evaluation model is established based on matter-element extension method. Finally, a specific example of a power transmission and transformation project in a certain area of Jiangsu province is analyzed, and corresponding countermeasures are put forward, which provides guarantee for the safe and effective operation of the power grid project in the future.
|
Received: 21 February 2019
Published: 12 September 2019
|
|
|
|
Cite this article: |
Zhou Haoqi,Yu Yunchuan,Gao Yinxia. Research on risk assessment of power grid operation based on matter-element extension[J]. Electrical Engineering, 2019, 20(9): 59-64.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2019/V20/I9/59
|
[1] Ipakchi A.Grid of the future[J]. IEEE Power & Energy Magazine, 2009(2): 52-62. [2] Jordi C, Alvaro B, Santiago C, et al.A medium-term integrated risk management model for a hydrothermal generation company[J]. IEEE Transactions on Power Systems, 2005, 20(3): 1379-1388. [3] Yue Yiding, Tan Jie.Study on identification and evaluation of financial risks of the listed company based on VAR[C]//International Conference on Management of Technology, Taiyuan, China, 2008: 441-445. [4] Nasim N, Seyedamirabbas M, Melike E K.A risk optimization model for enhanced power grid resilience against physical attacks[J]. Electric Power Systems Research, 2017, 143: 329-338 [5] 陶国飞. 基于AHP法与FSE法的电网公司运营风险的综合评价[J]. 科技传播, 2012(10): 77-78. [6] 弓建华, 雷丽萍, 武敏霞, 等. 基于TOPSIS法和灰色关联度的电网企业运营风险综合评价[J]. 广东电力, 2014(2): 7-10, 99. [7] 李存斌, 李鹏, 陆龚曙. 基于模糊数相似度的智能电网运营风险综合评价[J]. 华东电力, 2012(9): 1486-1489. [8] 林丽琼, 陈守军, 谭忠富. 电网运营风险预警评估的模糊故障树分析模型[J]. 华东电力, 2014(2): 229-235. [9] 李宏宇, 刘玉章. 变电运维中存在的隐患和应对措施探讨[J]. 中国高新技术企业, 2015(13): 154-155. [10] 王振善. 浅谈变电运维中隐患风险分析与应对技术[J]. 通信世界, 2015(4): 107-108. [11] 肖峻, 王成山, 罗凤章. 区间层次分析法的权重求解方法初探[J]. 系统工程与电子技术, 2004(11): 1597-1600. [12] 范利国, 牛东晓. 基于区间层次分析法的输电网规划综合评价决策[J]. 继电器, 2007, 35(12): 47-51. [13] 阿辽沙·叶, 祝恩国, 成倩, 等. 用电设备安全评估的改进区间层次分析法[J]. 电力系统及其自动化学报, 2015(1): 32-36. [14] 田书广. 基于改进可拓物元法的城轨车站运营风险评估方法研究[D]. 北京: 北京交通大学, 2014. [15] 代齐齐. 基于可拓学理论的地铁运营安全评价研究[D]. 成都: 西南交通大学, 2013. [16] 汪勇, 吴丽霞, 蔡明. 基于熵权模糊物元的轨道交通运营安全评价[J]. 交通运输研究, 2015(6): 51-57. |
|
|
|