|
|
The reformation of auxiliary power system interconnection in 300MW unit |
Ling Jiaguang, Jiang Hao, Jiang Qishan, Tian Daming |
Zhongshan Thermal Power Co., Ltd, Zhongshan, Guangdong 528431 |
|
|
Abstract This paper introduces the reformation scheme of 6kV auxiliary power system using cable interconnection. After the reformation, successfully using one auxiliary transformer loading two auxiliary power system to startup or shutdown unit, which greatly reduces the power consumption of stand-by transformer, and the economic benefits are obvious.
|
Received: 12 April 2019
Published: 19 December 2019
|
|
|
|
Cite this article: |
Ling Jiaguang,Jiang Hao,Jiang Qishan等. The reformation of auxiliary power system interconnection in 300MW unit[J]. Electrical Engineering, 2019, 20(12): 94-97.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2019/V20/I12/94
|
[1] 马传江, 尹建州. 发电厂6kV厂用电互联改造实践[J]. 电工技术, 2014(4): 61-62. [2] 刘辉. 给煤机变频器低电压穿越装置的优化配置方案[J]. 电气技术, 2018, 19(10): 59-61, 64. [3] 王旅. 应用等效电压源法计算发电厂高压母线短路电流[J]. 电气技术, 2018, 19(10): 92-94. [4] 李志强, 杨育峰, 同战峰. 某厂无扰动快切装置动作失败的原因分析[J]. 电气技术, 2018, 19(10): 100-101. [5] 王志龙, 霍静. 一起电厂厂用电快切装置误动的分析[J]. 电气技术, 2018, 19(2): 112-115. [6] 杜丽, 丁永生, 姜富修. 一种高压开关柜的热效应仿真方法[J]. 电气技术, 2017, 18(11): 133-137. [7] 刘刚, 熊小伏, 廖瑞金, 等. 泄漏电流对电流互感器误差特性的影响及分析[J]. 电工技术学报, 2018, 33(3): 697-704. [8] 冯建, 来磊, 石雷兵, 等. 交流电阻及其时间常数的准平衡式电桥精密测量技术[J]. 电工技术学报, 2017, 32(19): 187-192. [9] 赵红雁, 李艳, 杜吉飞, 等. 三相并网系统的一种快速相位检测方法[J]. 电工技术学报, 2016, 31(S2): 67-75. [10] SID-8BT-A中文技术说明书V1.10[Z]. 深圳市国立智能电力科技有限公司, 2015. [11] VD4中压真空断路器说明书[Z].VD4中压真空断路器说明书[Z]. 厦门ABB开关有限公司, 2009. |
|
|
|