Abstract In the case of large-scale disruption, the interval bi-directional capability failure of railway system has a long time duration and uncertainty. It is crucial to reschedule timetable and assign temporary dispatching orders to arrange transport operation and reduce effect in a short time. There exists two schemes of this problem, i.e. “wait and see” and “short turning”. In this paper, the applicability of the two solutions are analyzed on the basis of existing studies. A mixed integer- programming model of wait and see is developed with the consideration of specific scenarios and CPLEX is employed to get solutions. In addition, the paper makes qualitative analysis of the short turning scheme and discusses its applicability.
|
Received: 20 August 2019
Published: 08 January 2020
|
|
|
|
Cite this article: |
Zhou Haoran. Analysis and research of high-speed railway timetable rescheduling model for handling large-scale disruption[J]. Electrical Engineering, 2019, 20(ZK1): 37-43.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2019/V20/IZK1/37
|
[1] Cacchiani V, Huisman D, Kidd M, et al.An overview of recovery models and algorithms for real-time railway rescheduling[J]. Transportation Research Part B: Methodological, 2014, 63: 15-37. [2] Veelenturf L P, Kidd M P, Cacchiani V, et al.A railway timetable rescheduling approach for handling large- scale disruptions[J]. Transportation Science, 2016, 50(3): 841-862. [3] Dollevoet T, Huisman D, Kroon L G, et al.Application of an iterative framework for real-time railway rescheduling[J]. Computers & Operations Research, 2017, 78: 203-217. [4] 邓念, 彭其渊, 占曙光. 干扰条件下高速铁路列车运行实时调整问题研究[J]. 交通运输系统工程与信息, 2017, 17(4): 118-123. [5] 占曙光, 赵军, 彭其渊. 高速铁路区间能力部分失效情况下列车运行实时调整研究[J]. 铁道学报, 2016, 38(10): 1-13. [6] 孟令云, 杨肇夏, 李海鹰. 单线铁路区间能力失效条件下列车运行调整模型[J]. 系统工程理论与实践, 2012, 32(4): 885-894. [7] Luan Xiaojie, Wang Yihui, De Schutter B, et al.Integration of real-time traffic management and train control for rail networks-Part 2: Extensions towards energy-efficient train operations[J]. Transportation Research Part B: Methodological, 2018, 115: 72-94. [8] Nadjla Ghaemi, Oded Cats, Rob M.P. Goverde. Macroscopic multiple-station short-turning model in case of complete railway blockages[J]. Transportation Research Part C: Emerging Technologies, 2018, 89: 113-132. [9] Ghaemi N, Goverde R M P, Cats O. Railway disruption timetable: Short-turnings in case of complete blockage[C]//2016 IEEE International Conference on Intelligent Rail Transportation (ICIRT), 2016. [10] Veelenturf L P, Kroon L G, Maroti G.Passenger oriented railway disruption management by adapting timetables and rolling stock schedules[J]. Trans- portation Research Part C: Emerging Technologies, 2017, 80: 133-147. |
|
|
|