Research on post-evaluation of power grid technological transformation project based on matter-element extension |
Zhou Haoqi, Yu Yunchuan, Gao Yinxia |
Jiangsu Keneng Power Engineering Consulting Co., Ltd, Nanjing 210000 |
|
|
Abstract In view of the defect of single evaluation method for power grid technological transformation projects, the restriction of the original evaluation method is broken and the problem that the former post-evaluation method for technological transformation projects is greatly influenced by experts' subjectivity is avoided. In this paper, the matter-element extension evaluation method is introduced, and the post-evaluation model of technological transformation project based on the whole life cycle is established. The in-depth research is carried out from seven aspects of the project's preliminary work, project implementation preparation, project implementation management, final accounts management, file management, project investment control and project operation performance. Based on the comprehensive evaluation and analysis of the self-renovation and protection and replacement project of Suzhou 500kV Shipai substation, the practicability and effectiveness of the model are verified, which provides theoretical and technical support for guiding the post-evaluation work of technological transformation projects and strengthening technological transformation management work in the future.
|
Received: 17 October 2019
Published: 16 April 2020
|
|
|
|
Cite this article: |
Zhou Haoqi,Yu Yunchuan,Gao Yinxia. Research on post-evaluation of power grid technological transformation project based on matter-element extension[J]. Electrical Engineering, 2020, 21(4): 50-55.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2020/V21/I4/50
|
[1] 何仁杰. 论发电企业技改和大修项目的成本控制与管理[J]. 管理观察, 2012(25): 158. [2] 郑云峰. 技改大修项目管理存在的问题分析[J]. 低碳世界, 2014, 41(19): 84-85. [3] 李欣, 刘崇明, 陈运辉. 基于BP神经网络的火电厂技改项目成功度后评价研究[J]. 华东电力, 2010, 460(9): 1432-1435. [4] 李娟. 浅析电力设备大修技改的可行性[J]. 城市建设理论研究(电子版), 2016(11): 2682. [5] Eun Hong Kima, William G Well Jy, Michael R Duffey. A model for effective implementation of earned value management[J]. International Journal of Project Management, 2003(21): 375-382. [6] 李京光, 曹淦. 电力建设项目成功度模糊综合后评价方法[J]. 电力勘测设计, 2010(2): 1-4, 9. [7] 罗毅, 周创立, 刘向杰. 多层次灰色关联分析法在火电机组运行评价中的应用[J]. 中国电机工程学报, 2012(17): 97-103, 150. [8] 崔祥, 张云宁, 吴蓉, 等. 基于物元可拓理论的输变电工程造价风险评价[J]. 土木工程与管理学报, 2015, 32(4): 90-94, 101. [9] 牛东晓, 李建青. 基于物元可拓模型的火电厂建设项目过程后评价研究[J]. 华北电力大学学报: 自然科学版, 2010, 148(6): 49-54. |
|
|
|