Optimal configuration method and software design of energy storage capacity in distribution network including distributed power supply |
Guo Guowei1, Liu Pengxiang1, Xu Xinwei1, Peng Junjie1, Liang Yongquan2 |
1. Foshan Power Supply Bureau, Guangdong Power Grid Co., Ltd, Foshan, Guangdong 528000; 2. Guangdong Shunde Electric Power Design Institute Co., Ltd, Foshan, Guangdong 528300 |
|
|
Abstract The connection of renewable energy makes the power fluctuation of the tie-line between the distribution network and the main network larger, which affects the safe and stable operation of the system. Energy storage system can effectively solve this problem. Therefore, a method of energy storage capacity allocation is proposed in this paper. The model uses mixed integer linear programming (MILP) to solve the optimal energy storage capacity with the constraint of controlling the power of the tie-line in the distribution network. A set of energy storage planning and design software is designed to solve the energy storage configuration problem of distribution network with distributed generation. The feasibility and validity of the method are verified by the allocation of the energy storage capacity of a project.
|
Received: 21 May 2019
Published: 16 April 2020
|
|
|
|
Cite this article: |
Guo Guowei,Liu Pengxiang,Xu Xinwei等. Optimal configuration method and software design of energy storage capacity in distribution network including distributed power supply[J]. Electrical Engineering, 2020, 21(4): 56-60.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2020/V21/I4/56
|
[1] 张明, 朴政国. 含储能的分布式光伏并网系统对配电网调峰的研究[J]. 电气技术, 2016, 17(12): 11-14, 19. [2] 廖怀庆, 刘东, 黄玉辉, 等. 基于大规模储能系统的智能电网兼容性研究[J]. 电力系统自动化, 2010, 34(2): 15-19. [3] 吴小刚, 刘宗歧, 田立亭, 等. 基于改进多目标粒子群算法的配电网储能选址定容[J]. 电网技术, 2014, 38(12): 3405-3411. [4] 杨玉青, 牛利勇, 田立亭, 等. 考虑负荷优化控制的区域配电网储能配置[J]. 电网技术, 2015, 39(4): 1019-1025. [5] 章美丹, 宋晓喆, 辛焕海, 等. 计及网损的配电网电池储能站优化运行策略[J]. 电网技术, 2013, 37(8): 2123-2128. [6] 胡荣, 任锐焕, 杨帆, 等. 配电网中储能系统优化配置研究[J]. 华东电力, 2014, 42(2): 345-349. [7] Chaiyatham T, Ngamroo I.Bee colony optimization of battery capacity and placement for mitigation of voltage rise by PV in radial distribution network[C]// 2012 Conference on Power & Energy-IPEC, 2012: 13-18. [8] 王成山, 于波, 肖峻, 等. 平滑微电网联络线功率波动的储能系统容量优化方法[J]. 电力系统自动化, 2013, 37(3): 12-17. [9] 陈聪伟, 江修波, 刘丽军. 考虑时序与储能配合的分布式电源优化配置研究[J]. 电气技术, 2017, 18(6): 41-47. [10] 汤杰, 李欣然, 黄际元, 等. 以净效益最大为目标的储能电池参与二次调频的容量配置方法[J]. 电工技术学报, 2019, 34(5): 963-972. [11] 颜宁, 厉伟, 邢作霞, 等. 复合储能在主动配电网中的容量配置[J]. 电工技术学报, 2017, 32(19): 180-186. [12] Ru Yu, Kleissl J, Martinez S.Storage size deter- mination for grid-connected photovoltaic systems[J]. IEEE Transactions on Sustainable Energy, 2013, 4(1): 68-81. [13] 翁桂萍, 潘夏, 邵振国. 计及峰谷电价和启发式运行策略的风光储联合发电用户容量优化[J]. 电气技术, 2016, 17(5): 1-6. [14] 李建林, 郭斌琪, 牛萌, 等. 风光储系统储能容量优化配置策略[J]. 电工技术学报, 2018, 33(6): 1189-1196. [15] 刘春阳, 王秀丽, 刘世民, 等. 计及蓄电池使用寿命的微电网经济调度模型[J]. 电力自动化设备, 2015(10): 29-36. |
|
|
|