Research on special tool for measuring the bending degree of conductor splicing pipe in electricity transmission line |
Huang Shuangde, Zeng Xiaoyang, Li Xinjiang |
Power Supply Bureau, Yunnan Power Grid Co., Ltd, Kunming 650011 |
|
|
Abstract Article in view of the transmission line guide ground pressure control of the status quo of bending measurement, there is no special tools to ensure that the transmission line pressure to take over after bending deformation meet the power transmission and transformation project overhead conductor and the ground hydraulic pressure welding procedure, special transmission line pressure to take over the curvature measuring tool was developed, using fixed base, track and measure after pressure over the length of the sliding base, quantity measurement device by bending of the orbit of sliding up and down and automatic telescopic measured before and after each point bending capacity, so as to determine the pressure to take over the maximum bending capacity, make the acceptance of construction personnel can directly determine the pressure over the quality, the pressure to improve the reliability of the equipment, It has good application value in the construction technology control of transmission line pressure takeover.
|
Received: 22 May 2020
|
|
|
|
Cite this article: |
Huang Shuangde,Zeng Xiaoyang,Li Xinjiang. Research on special tool for measuring the bending degree of conductor splicing pipe in electricity transmission line[J]. Electrical Engineering, 2020, 21(12): 74-77.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2020/V21/I12/74
|
[1] DL/T 5285—2013L/T 5285—2013. 输变电工程架空导线及地线液压压接工艺规程[S]. 北京: 北京电力出版社, 2013. [2] 何伏生. 浅谈架线施工中导、地线接续管布置与控制[J]. 中国新技术新产品, 2019(15): 74-75. [3] 董吉谔. 电力金具手册[M]. 北京: 水利电力出版社, 2010. [4] 李平, 杜超, 张涛, 等. 架空输电线路导线压接质量提升措施[J]. 通讯世界, 2018(4): 199-200. [5] GB 50233—2014B 50233—2014. 110kV~750kV架空输电线路施工及验收规范[S]. 北京: 中国计划出版社, 2015. [6] 曾东, 张东, 戚志磊, 等. 提高新疆输电工程建设质量的管理措施[J]. 电气技术, 2016, 17(8): 145-148. |
|
|
|