Electrical Engineering  2021, Vol. 22 Issue (5): 73-77    DOI:
Technology & Application Current Issue| Next Issue| Archive| Adv Search |
The secondary system test scheme of 500kV Tingzikou hydropower station extension project
LI Yonglong1, FANG Yuan1, WANG Fengyue1, XIONG Zhonghao1, ZHAO Guoya2
1. Datang Hydropower Science & Technology Research Institude, Chengdu 610073;
2. Jialing River Tingzikou Water Resources and Hydropower Co., Ltd, Guangyuan, Sichuan 628400

Download: PDF (791 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  During the trough period after the grid-connected power generation of Tingzikou hydropower station, due to the high bus voltage, the generator is in under-excitation operation for a long time, and the guide vane opening of the water turbine unit is small, and operation in the vibration zone will cause some damage to the water turbine unit, which can be solved by installing a high-voltage parallel reactor. The expansion under the full shutdown mode will seriously affect the economic benefits of hydropower station and the grid structure. Therefore, this research studies the secondary system test scheme for the expansion project of 500kV hydropower station under the non-stop mode, and analyzes in detail the changes of the protection configuration in the past during the expansion process. According to the analysis results, debugging methods such as the circuit wiring that needs to be removed after the protection configuration changes and the arrangement of secondary safety measures in this mode are put forward to eliminate potential safety hazards during the test. Through the expansion project of Tingzikou Hydropower Station, it is proved that the scheme is safe and reliable, and it provides some reference for the future expansion of the hydropower station.
Key wordshydropower station      non-full shutdown mode      secondary safety measures      reactor     
Received: 15 September 2020     
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
LI Yonglong
FANG Yuan
WANG Fengyue
XIONG Zhonghao
ZHAO Guoya
Cite this article:   
LI Yonglong,FANG Yuan,WANG Fengyue等. The secondary system test scheme of 500kV Tingzikou hydropower station extension project[J]. Electrical Engineering, 2021, 22(5): 73-77.
URL:  
https://dqjs.cesmedia.cn/EN/Y2021/V22/I5/73
Copyright © Electrical Engineering
Supported by: Beijing Magtech