Research and application analysis of 3/2 isolating switch (double break) bus ring wiring |
HONG Zhipeng |
Sichuan Electric Power Design & Consulting Co., Ltd, Chengdu 610041 |
|
|
Abstract In view of the excessive number of switching elements in the double busbar connection, inspired by the 3/2 circuit breaker connection, this paper proposes the 3/2 isolating switch bus ring connection. In the expansion of the double busbar connection gas insulated switchgear (GIS) equipment, the double busbar should be stopped when the AC withstand voltage test is performed, so this paper introduces double-break isolating switch, which is a new 3/2 isolating switch (double-break) bus ring wiring, to realize the uninterrupted expansion of the original operation line.
|
Received: 16 August 2021
|
|
|
|
Cite this article: |
HONG Zhipeng. Research and application analysis of 3/2 isolating switch (double break) bus ring wiring[J]. Electrical Engineering, 2021, 22(12): 94-98.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2021/V22/I12/94
|
[1] 杨勇, 叶瑞, 王洪川. 气体绝缘封闭金属开关设备与气体绝缘输电线路应力分类及其校核标准比较[J]. 电气技术, 2020, 21(12): 87-91. [2] 赵书涛, 王波, 华回春,等. 基于马尔科夫模型的直流断路器可靠性评估方法[J]. 电工技术学报, 2019, 34(增刊1): 126-132. [3] 220kV~750kV变电站设计技术规程: DL/T 5218—2012[S] DL/T 5218—2012[S]. 北京: 中国计划出版社, 2012. [4] 雷宏, 姜源, 焦国锋. 集成式隔离断路器在一个半断路器接线中的设计应用[J]. 电气技术, 2019, 20(6): 81-84. [5] 肖彦娟, 丁坚勇. 基于故障树的电气主接线可靠性及薄弱环节分析[J]. 电测与仪表, 2020(16): 12-16. [6] 鲁宗相, 郭永基. 水电站电气主接线可靠性评估[J]. 电力系统自动化, 2001, 25(18): 16-19. [7] 黎卫国, 张长虹, 杨旭,等. 双隔离断口GIS功能模块仿真计算及试验验证[J]. 高压电器, 2020, 56(3): 30-38. [8] 葛国伟, 廖敏夫, 黄金强,等. 双断口真空断路器配合特性仿真与试验[J]. 电工技术学报, 2016, 31(22): 57-65. [9] 李锦辉. GIS交流耐压试验盆式绝缘子闪络的原因及防范措施[J]. 电气技术, 2018, 19(9): 119-121. [10] 何聪, 张芊, 曹铎耀,等. 交流与操作冲击叠加电压下SF6气体中沿面局部放电特性[J]. 电工技术学报, 2020, 35(8): 1807-1817. |
|
|
|