Research on the Tripping Circuit Delay-Started of the Forced-oil Circulated Air-cooler Completed Shutdown in 220kv’s Main Transformer |
Qui Yanfeng, Zeng Zhaohui |
Meizhou power supply bureau of Guangdong Power Grid, Meizhou, Guangdong 514021 |
|
|
Abstract Forced-oil circulated air-cooler has been used widely in the 220kV’s main transformer, the completed shutdown tripping circuit of the cooler is the important one in the secondary circuit. The articles attends to analysis the completed shutdown tripping circuit in the forced-oil circulated air-cooler and make corresponding suggestions for the existing problems.
|
|
|
|
|
Cite this article: |
Qui Yanfeng,Zeng Zhaohui. Research on the Tripping Circuit Delay-Started of the Forced-oil Circulated Air-cooler Completed Shutdown in 220kv’s Main Transformer[J]. Electrical Engineering, 2013, 14(6): 71-74.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2013/V14/I6/71
|
[1] S. 00. 00. 05/Q102-0012-0909-7256广东电网公司电力变压器(含高抗)技术规范[S]. [2] 广东省电力调度中心.广东省电力系统继电保护反事故措施及释义[M].北京:中国电力出版社, 2007. [3] 国家电力调度通信中心.电力系统继电保护实用技术问答[M].2版.北京:中国电力出版社, 2000. [4] 熊信银,朱永利,范锡普.发电厂电气部分[M]. 3版.北京:中国电力出版社, 2004. [5] 袁乃志.发电厂和变电站电气二次回路技术[M].北京:中国电力出版社, 2004. [6] 赵剑波,肖承仟,王予生,赵忠义. 220kV主变风冷装置全停故障原因分析及其二次回路改造[J].高压电器, 2011, 47(5): 96-99. [7] 孙德臣. 500kV主变压器冷却器全停跳闸分析及处理[J].中国电力教育, 2012, (12): 128. [8] 施翼.强油循环变压器风冷运行分析[J].电气工程与自动化, 2010, (12): 114. |
|
|
|