The Optimizing Methods to Design the Precharging Circuit of Grid Connected Convertor for Direct-drive Wind Turbine |
Gu Weifeng, Zhao Xinlong ,Yang Zhiqian |
Beijing Etechwin Electric Co., Ltd, Beijing 100176 |
|
|
Abstract Before connected with the grid, the DC bus capacitors of wind convertor are discharged completely. In order to keep from producing large impulse current to damage grid side breaker and DC bus capacitors while grid connected, a circuit should be designed to precharge the DC bus capacitors before grid side breaker switches on. Based on the analysis of the shortage of common precharging circuits, the optimizing methods to design three phase and single phase full bridge precharging circuit are improved. The validity of the design methods is supported by simulation result. Moreover,for the converter with larger DC bus capacitor, a novel low power consumption capacitive precharging circuit is proposed.
|
Published: 11 June 2014
|
|
|
|
Cite this article: |
Gu Weifeng,Zhao Xinlong,Yang Zhiqian. The Optimizing Methods to Design the Precharging Circuit of Grid Connected Convertor for Direct-drive Wind Turbine[J]. Electrical Engineering, 2014, 15(06): 90-92.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2014/V15/I06/90
|
[1] 王硕.大功率直驱风力并网变流器研制[D].北京:北京交通大学,2011. [2] 郭瑞,张柳, 谷彩连. 大功率直驱风力发电机组并网变流器的研究[J].低压电器,2012(6):24-27. [3] 邹档兵,翁星方,荣智林,黄南.轨道牵引用主变流器充放电电阻的参数计算与选型方法[J]. 机车电传动, 2012(3):20-22. [4] 王兆安,黄俊.电力电子技术[M].北京:机械工业出版社,2005. [5] 洪乃刚.电力电子和电力拖动控制系统的Matlab仿真[M].北京:机械工业出版社,2006. [6] 徐洪庆. 三相PWM整流系统研究[D].哈尔滨: 哈尔滨工程大学,2008. |
|
|
|