|
|
Discussion on Relative Problems of Indoor 110kV Substation’s Typical Design |
Li Xiaohui1, Yu Sheng2 |
1.Guangdong Grid Co of Dongguan Power Supply Bureau, Dongguan, Guangdong 523000; 2.Taiyuan University of Technology College of electrical and power engineering, Taiyuan 030024 |
|
|
Abstract So far, most of the literature is on the research about the reliability of relay protection system, and little on the research about the effect of the first equipment reliability on the relay protection system availability. This paper first introduces the evaluation indices of reliability, availability, failure rate and repair rate, then based on considering the self-checking function of the relay protection system, introducing the state overhaul. The Markov model of the first equipment and protection system is established, and then the state space method is used to calculate the steady-state availability of relay protection. Through MATLAB simulation to find the relationship curve between protection system availability and the first equipment reliability. Generalize a conclusion that the protection system availability is effected more by itself’s reliability than the first device's.
|
Published: 04 November 2014
|
|
|
|
[1] 郭日彩,许子智,徐鑫乾.220kV和110kV变电站典型设计研究与应用[J].电网技术,2007(6). [2] 田学农,陈代云. 110kV户内变电站的小型化设计[J].继电器,1999(4). [3] 刘振亚. 国家电网公司输变电工程通用设计(2011版)[Z].北京:中国电力出版社,2011. [4] 金淋芳. 城市全户内变电站主变压器室通风降噪研究[J]. 供用电,2010(4). |
|
|
|