Transmission Line Linear Dreaking Strain Methods of Change |
Li Chunsheng, Xiao Chunwei, Guo Xiaofeng |
Pingdingshan He’nan Electric Power Company Power Company Maintenance Department Maintenance Department Seized Power Transmission Transportation Professionals, Pingdingshan, He’nan 467001 |
|
|
Abstract This article describes the tower without anchoring both ends of the ground guide ways, and then mark it on the tower, so that the ground lead to the ground after loosening, mark the outside of the ground in the guide, the guide is fixed and tightened breaking ground, pressed clamp on cables connected. The traditional way to solve a complex operating procedures hang tight, realized using small pole (or use an existing tower fixed point) to the linear transmission line method for breaking job-resistant sheets changed, the objective being to solve the transformation of the traditional environmental impact of power lines (eg length o'clock officers dispersed, Channel hard) and anchor lines, pumping long lines and other lines of construction period of transformation difficulties.
|
Published: 05 November 2014
|
|
|
|
[1] 《国家电网公司电力安全工作规程》(线路部分)[S].北京:中国电力出版社, 2009. [2] 单中圻,王清葵. 送电线路施工[M]. 北京:中国电力出版社, 2003. [3] 国家能源局. 架空输电线路运行规程[S]. 北京:中国电力出版社,2010. |
|
|
|