110kV substation Economic Operation and Efficiency Analysis |
Li Jianjun, Liu Xiaolin, Yuan Zhenlin |
Yueyang Power Company,Yueyang, Hu’nan 414000 |
|
|
Abstract Yueyang Power Grid 110kV substation as an example,confirmed the reasonable necessity of choice substation operation mode,The results can be used to real-time monitoring and scheduling of the main transformer switching way to achieve economic operation of the power grid,reduce the power loss of the transformer,improve economic efficiency.
|
Published: 22 December 2014
|
|
|
|