Analysis of New Power Plant Voltage Phase Error |
Zhang Ping, Zhou Chun |
Huadian Electric Power Reseach Institute, Hangzhou 310030 |
|
|
Abstract A test of connection to a grid under the false synchronization for electric generating unit to be connected to the grid must be done before it’s operated into the system. Check the outlet of generator unit and the secondary voltage of bus PT are all met the requirements of synchronization, in order to further confirm it meets the requirements of the phase, differential voltage.
|
Published: 22 December 2014
|
|
|
|