Remote and Local Operating Optimization in the Smart Substation |
Chen Guiyou Zhu Herong Xiong Muwen Liu Yonggang Xu Dongfang |
NR Electric Co., Ltd, Nanjing 210003 |
|
|
Abstract In order to be more safe, convenient for manual operation, according to “operating level in local position” the principle of the smart substation to optimize the design of remote and local operating handle. The BCU increase increases virtual terminal to receive the process signal of manual synchronization, remote position, Interlocking disable, In order to prevent misoperation. After operation loop optimization, namely can complete the manual operation in the bay level, also can complete the manual operation in the process level. But whether in the bay level or the process level, can realize manual synchronization. Compared with the existing schemes operating positionselection more flexible, the operation is more safe.
|
Received: 20 April 2015
Published: 23 March 2015
|
|
|
|
Cite this article: |
Chen Guiyou Zhu Herong Xiong Muwen Liu Yonggang Xu Dongfang. Remote and Local Operating Optimization in the Smart Substation[J]. Electrical Engineering, 2015, 16(03): 79-81.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2015/V16/I03/79
|
[1] 高东学, 智全中, 朱丽均. 智变电站保护配置方案研究[J]. 电力系统保护与控制, 2012, 40(1): 68-71. [2] 易永辉, 王雷涛, 陶永健. 智能变电站过程层应用技术研究[J]. 电力系统保护与控制, 2010, 38(21): 1-5. [3] 沙建峰, 韩潇, 李永敬. 变电站同期合闸功能原理及典型故障的研究[J]. 电力系统保护与控制, 2011, 39(19): 141-144. [4] 张敏, 刘湘琼, 范培培, 等. 一种智能变电站手合检同期的方法[J]. 电力系统自动化, 2012, 36(17): 82-85. [5] 陈希炜, 谢文涛, 张敏. 基于IEC61850的超高压变电站联锁控制系统改造的应用[J]. 电力系统保护与控制, 2010, 38(15): 123-160. [6] 胡绍谦, 杭剑文, 王文龙. 数字化变电站的间隔层联锁扩建方案研究[J]. 电力系统保护与控制, 2010, 38(11): 109-112. |
|
|
|