| 
					
						|  |  
    					|  |  
    					| High-speed Rail Power Supply Integrated Automation System Aplications and Research |  
						| Chen Jingfeng, Liu Wei, Li Yongzheng |  
						| Nanjing State Power South Rail Transit Project Co., Ltd, Nanjing 210000 |  
						|  |  
					
						| 
								
									| 
											
                        					 
												
													
													    |  |  
														| 
													
													    | Abstract  Traction power supply, communications, signal, power four-electricity integration project content in high-speed rail power supply integrated automation system complete high-speed rail construction projects, the integrated system covering the high-speed railway traction substation automation system, electric power distributing station automation system, security systems, power quality analysis and fault recorder system, auto-transformer protection and control system, catenary switch control system functions to provide a complete solution for high-speed rail power supply integrated automation system. |  
															| Received: 26 June 2014 |  |  |  |  
														
															| Cite this article: |  
															| Chen Jingfeng,Liu Wei,Li Yongzheng. High-speed Rail Power Supply Integrated Automation System Aplications and Research[J]. Electrical Engineering, 2013, 14(5): 84-87. |  |  |  
															|  |  |  |  
															| URL: |  
															| https://dqjs.cesmedia.cn/EN/Y2013/V14/I5/84 |  
													
																												  
															| [1] 于海生, 等.微型计算机控制技术[M]. 北京:清华大学出版社, 1999. [2] 王子渊. 浅谈MSTP对高速铁路数据业务的承载方式[J]. 铁道勘测与设计, 2010(1):95-98, 104.
 |  
											 
											 |  |  |