The Investigation of the Prefabricated Substation Cabinet Design of Rainproof Functional Structure |
Zhang Qimeng1, Lv Da2, Wu Min1, Gong Xiaobin2, Yuan RongJie2 |
1. Ningbo Tianyuan Electric Group Co., Ltd, Ningbo, Zhejiang 315700; 2.Ningbo Xiangshan Power Supply Bureau, Ningbo, Zhejiang 315700 |
|
Cite this article: |
Zhang Qimeng, Lv Da,Wu Min等. The Investigation of the Prefabricated Substation Cabinet Design of Rainproof Functional Structure[J]. Electrical Engineering, 2014, 15(01): 71-75.
|
|
|
|
URL: |
https://dqjs.cesmedia.cn/EN/Y2014/V15/I01/71
|
[1] 肖敏英,邓永辉.浅谈高压/低压预装箱式变电站技术与应用[J].电控配电, 2006(2):2. [2] 国家标准.GB17467-2010《高压/低压预装式变电站》. |
|
|
|