发电厂设备接地的方法及应用
李纪华
国核电力规划设计研究院,北京 100095
Equipment Grounding Method and Application in Power Plant
Li Jihua
Guangzhou Wanglong Thermoelectricity Co., Ltd, Guangzhou 511340
摘要 国内常规发电厂接地设计中,往往比较简单,仅在接地布置图中将接地系统概略的表示出来。本文将有关规程规范进行了细化,阐述了发电厂接地网更为细致的设计方法,可示意到具体设备、设施接地,并结合具体工程应用进行了详细阐述。本文对未来发电厂接地设计和现场施工具有较好的参考价值。
关键词 :
发电厂 ,
设备接地 ,
裸铜绞线
Abstract :At present, domestic power plant grounding design tend to be too simple. Combining with engineering practice, this paper refined related Chinese codes and standards, give more precise grounding design method, i.e., grounding to specific equipment. it also elaborated specific engineering application in details. This paper is valuable for future grounding design and onsite construction in power plant.
Key words :
power plant
equipment grounding
copper strand
出版日期: 2014-06-24
作者简介 : 李纪华(1978-),硕士,工程师,从事的研究方向或专业工作内容:从事发电厂的设计、采购、施工、绘图等工作。
引用本文:
李纪华. 发电厂设备接地的方法及应用[J]. 电气技术, 2014, 15(05): 105-108.
Li Jihua. Equipment Grounding Method and Application in Power Plant. Electrical Engineering, 2014, 15(05): 105-108.
链接本文:
http://dqjs.cesmedia.cn/CN/Y2014/V15/I05/105
[1] DL/T 621—1997 交流电气装置的接地[S]. [2] IEEE Std 80-2000, IEEE Guide for Safety in AC Substation Grounding[S]. [3] GB/T 50065—2011 交流电气装置的接地设计规范[S]. [4] 水利电力部西北电力设计院. 电力工程电气设计手册(第一册):电气一次部分[M]. 北京: 中国电力出版社, 1989.12.
[1]
孙贺斌, 周治伊, 李辉, 王晨山. 基建期火力发电厂金属技术监督全过程管理 [J]. 电气技术, 2020, 21(4): 113-115.
[2]
张翼, 张健, 吕兆俊, 邹建春. 发电厂厂用电系统中无功功率运行现状浅析 [J]. 电气技术, 2018, 19(4): 58-62.
[3]
董德, 魏林邦, 江雨, 刘胜利, 曹铁山. 水力发电厂直流系统故障分析与处理 [J]. 电气技术, 2017, 18(6): 68-72.
[4]
颜全椿, 杨宏宇, 李辰龙. 发电厂继电保护中IEC反时限特性级差配合的整定计算方法 [J]. 电气技术, 2017, 18(5): 63-67.
[5]
周道军. 大型机组发电机断路器配置分析 [J]. 电气技术, 2016, 17(2): 102-105.
[6]
曾玲. 合同能源管理在发电厂的应用 [J]. 电气技术, 2014, 15(05): 120-122.
[7]
戴苏平. 发电厂电气主接线可靠性比较分析 [J]. 电气技术, 2014, 15(01): 76-77.
[8]
郑坤. 发电厂电气设备故障分析及管理 [J]. 电气技术, 2014, 15(01): 97-98.