Discussion on Optimization Scheme of Auxiliary Power of Power plant with Single Row Configuration Scheme of Power Plant
Peng Zhe1, Liu Xiaopeng2
1. Hebei Electric Power Design & Research Institute, Shijiazhuang 050031; 2. Guodian & JianTou Inner Mongolia Energy Investment Co., Ltd, Erdos, Inner Mongolia 017209
Abstract:The paper analyses medium auxiliary power wiring design of Bulian power plant of fist phase, with capacity 2×660MW, Ultra-supercritical coal-fired air-cooling, adopts single row configuration scheme and goes into operation for first time in China, focuses on an introduction to configuration of communal bus duct setting and selection of 10kV auxiliary voltage level, and also, for reference, makes a comparison of auxiliary power ratio under various operation modes through detailed data, puts forward relevant conclusions and recommendations for reference.
彭哲, 刘晓鹏. 辅机单列配置下的厂用电优化方案[J]. 电气技术, 2016, 17(4): 126-129.
Peng Zhe, Liu Xiaopeng. Discussion on Optimization Scheme of Auxiliary Power of Power plant with Single Row Configuration Scheme of Power Plant. Electrical Engineering, 2016, 17(4): 126-129.