Abstract:Identifying the key factor in power transmission project cost risk is a prerequisite for effective control of their potential risk of loss. There are many risks in current power transmission project cost control, and the degree of impact on the project cost risk is not same. In order to make more effective control of power transmission project risk cost, using questionnaire and directed cluster analysis method, through the empirical analysis to clustering various risk factors of transmission project cost, summarized the risk factors which are relative prominence. Refining these risk factors will help the cost staff of power transmission project to understand and mitigate the risk of cost.
李国文, 刘迪, 罗海红. 基于有向聚类的输变电工程造价风险因素分析[J]. 电气技术, 2018, 19(3): 90-94.
Li Guowen, Liu Di, Luo Haihong. The directed cluster analysis of cost risk on power transmission project. Electrical Engineering, 2018, 19(3): 90-94.